EN 1090-2 · EXC3 Sežana, SI · Est. 1994 · 6 200 m² shop floor

We detail it, cut it, weld it, and stand it up.

Structural steel and architectural metalwork from one shop — connection design, CNC profiling, certified welding, coating and erection. One drawing set, one welding book, one number to call when the site foreman finds a problem at 06:40.

Priced in 3 working days · Typical lead time 5–7 weeks

EN 1090-2Execution class EXC3, factory production control certified
EN ISO 3834-2Comprehensive quality requirements for fusion welding
ISO 9001:2015Audited annually, last audit March 2026
EN ISO 12944Coating systems to C4 High, 25-year durability
0Covered shop floor
0Max single lift, in-house crane
0Max fabricated member length
0Certified welders on staff
01 / DETAILING

Every connection
drawn before
anything is cut.

Our detailers model the whole frame in Tekla and issue the connection design with the fabrication drawings. Nothing goes to the saw until the engineer has stamped the joint it is going into.

DRG. NO. FW-2614-S03
PORTAL FRAME — ELEVATION
SCALE 1:50
REV C
STATUS: FOR CONSTRUCTION
24 000 mm 7 200 mm 9 850 mm APEX SPLICE — 12 No. M24 8.8 HAUNCH — IPE 450 CUT BASE PLATE 400×400×25 FERRO WORKS · TEKLA MODEL 2614 · ALL WELDS 6 FW U.N.O.

Scroll to draw · Issued drawings carry a revision cloud and a fabrication release stamp

02 / CAPABILITY

What the shop
can actually do.

A

Structural frames

Portal frames, multi-storey beam-and-column, mezzanines and crane gantries. Members to 18 m and 32 tonnes, drilled and coped on a CNC beam line so nothing is marked out by hand on the floor.

to 18 m · 32 t
B

Plate & profile cutting

Plasma and oxy-fuel to 120 mm on a 3 × 12 m bed, with bevelling for full-penetration welds cut in the same pass. Nesting is done from the model, so offcut yield sits around 88%.

to 120 mm · 3×12 m
C

Certified welding

MAG, MMA and submerged arc, with twelve coded welders and WPQRs held for S235 through S460. Every structural weld is logged against a joint number and a welder stamp.

EN ISO 3834-2
D

Architectural metalwork

Staircases, balustrades, canopies and facade support where the steel is meant to be looked at. Ground welds, blended radii and a coating spec chosen for how it will look in ten years, not ten weeks.

Visible-grade finish
E

Surface treatment

In-house shot blasting to Sa 2½, then metallising, primer and topcoat to EN ISO 12944 up to C5-M. Doing it here means the steel is not sitting in a yard somewhere waiting for a subcontractor's line.

Sa 2½ · to C5-M
F

Erection

Our own crews and rigging, working to a lift plan issued with the drawings. Site survey before fabrication starts, so the holding-down bolts are checked against the model rather than against hope.

Own crews · SI, IT, AT, HR
03 / PROCESS

Drawings to
steel standing.

Five stages, one project manager, and a weekly one-page report that says what is cut, what is welded and what is late.

01

Enquiry & take-off

Send an IFC, a DWG or a hand sketch. We take off tonnage, connections and coating area and come back with a priced breakdown in three working days.

02

Detailing

Tekla model, connection design stamped by our engineer, then fabrication and erection drawings issued for approval. Nothing is cut before approval comes back.

03

Fabrication

CNC profiling, fit-up, welding and NDT. Each assembly gets a mark number that follows it from the saw to the site, on paper and on a stamped tag.

04

Blast & coat

Shot blast, metallise where the spec asks for it, prime and topcoat. Dry film thickness measured and recorded per assembly, not per batch.

05

Delivery & erection

Loaded in erection sequence so the first thing off the truck is the first thing lifted. Our crew stands it, plumbs it, torques it and hands over the bolt records.

04 / SHOP SPEC

The machines,
and their limits.

Published because it saves everyone a phone call. If your member is longer than 18 m we will tell you that on the first email rather than the fourth.

OperationMachineCapacityToleranceStatus
Beam drilling & sawingCNC beam line, 3-spindle1 200 × 500 mm, to 18 m± 1.0 mmAvailable
Plate cuttingPlasma / oxy, bevel head3 000 × 12 000 mm, to 120 mm± 1.5 mmAvailable
Plate rolling4-roll, 3 m3 000 mm × 25 mm± 2.0 mmAvailable
Press braking320 t hydraulic4 000 mm × 20 mm± 0.5 mmAvailable
WeldingMAG / MMA / SAWS235–S460, to 60 mmEN ISO 5817 level B12 coded welders
Shot blastingRoller conveyor cabinet1 500 × 800 mm sectionSa 2½Available
CoatingAirless spray, heated booth18 m × 4 m × 4 mDFT per assemblyto C5-M
Lifting2 × overhead crane32 t combinedAvailable
05 / PROJECTS

Recent
steel.

Industrial

Logistics hall, Divača

Twelve portal frames at 24 m span, plus a 10 t crane gantry running the full length. Erected in nine days between two shifts of an operating warehouse.

Tonnage
412 t
Span
24 m
Completed
2026
Architectural

Feature stair, Ljubljana

Four-flight cantilevered stair with a folded 12 mm plate stringer and no visible fixings. Every weld ground flush and coated to a paint spec agreed with the architect on a sample panel.

Tonnage
18 t
Flights
4
Completed
2025
Infrastructure

Footbridge, Vipava

A 38 m single-span truss lifted in two sections overnight with the road closed for four hours. Weathering steel, no coating, designed to be left alone for thirty years.

Tonnage
96 t
Span
38 m
Completed
2025
06 / LAST 12 MONTHS

Measured,
not claimed.

0Steel fabricated
0Projects delivered
0Delivered on or before date
0Lost-time incidents
07 / SITE

From the people
who had to lift it.

“The steel arrived in erection sequence with the bolts taped to the right assemblies. I have been on sites for twenty years and that had never happened before.”
Boris Zupan · Site manager, Kolektor Gradnje
“They caught a clash between our services and their bracing in the model, three weeks before anything was cut. That one email saved us a fortnight.”
Nina Rossi · Project engineer, Studio Rossi
“Weld records, DFT readings, torque sheets — all handed over on the day. The building control inspector went home early.”
08 / QUESTIONS

Asked often.

What do you need to quote?

A general arrangement and a member schedule is enough for a budget figure. For a firm price we need connection loads or permission to design the connections ourselves. An IFC model is ideal; a marked-up PDF is fine.

How long does it take?

Price in three working days. From approved drawings, a typical 200–400 t frame is five to seven weeks through the shop. Architectural metalwork runs longer because the finish work is slower and cannot be rushed honestly.

Do you work outside Slovenia?

Regularly — northern Italy, Austria and Croatia, with our own erection crews. CE marking under EN 1090 is in place, so the declaration of performance travels with the steel.

Can you take over a stalled job?

Yes, and about one in ten of our projects arrives that way. We will re-check the existing model and tell you honestly what can be reused and what has to be re-made before we quote it.

09 / ENQUIRY

Send us
the drawings.

Priced in three working days, by an engineer who has read them.

Or call +386 5 731 44 20 · Mon–Fri 06:00–16:00

Site by PROBULL ↗